Back to BlogCompliance

Labour Inspection With Contract Workers: What to Keep Ready

07 Nov 2026 9 min read

A labour inspection at a factory with contract workers has an awkward feature: the inspector is standing in your premises, asking about people on someone else's payroll, and the records that answer the questions may be sitting in the contractor's office across town. Most factories discover how much of their compliance depends on another company's paperwork only when someone asks to see it. This post sets out who may come, which documents the factory should hold itself, which it should be able to get from the contractor at short notice, what an inspection actually tests, and how to handle the day and the weeks after it. It is a practical guide rather than legal advice, and the rules underneath it are still moving, so check the specifics with your labour-law consultant.

Who can come, and what has changed

More than one authority has reason to visit a factory. The Labour Department looks at wages, contract labour and working conditions. The Factories Department looks at safety, health and the conditions of the plant. EPFO and ESIC have their own officers, who look at provident fund and insurance coverage. These visits are separate and do not cancel each other out, so a clean visit from one tells you nothing about the next. India's four labour codes, which commenced on 21 November 2025, renamed the central figure the Inspector-cum-Facilitator, and the title is meant literally: the role includes advising employers and workers on compliance as well as enforcing it. The codes also allow for an inspection scheme that can use web-based, computer-generated schedules and call for information electronically, in place of a purely discretionary visit. How much of that you see in practice depends on the state. Telangana published draft rules under the codes during 2026, including for occupational safety and social security, so confirm with your consultant which rules and forms are final when you read this. A complaint from a worker, an accident or a dispute can still bring someone to the gate regardless of any schedule.

Why the contractor's records are your problem

On paper, the contractor is the direct employer and keeps most of the worker records. That division does not help much on the day. The inspector is at your site, the workers are on your floor, and the law gives the principal employer real exposure when a contractor defaults on wages or statutory dues. If the contractor cannot produce a register, the practical question quickly becomes what you, as the principal employer, did to satisfy yourself that the workers were being treated lawfully. A contractor who is slow to answer the phone that afternoon leaves you explaining someone else's records without having seen them. So treat inspection readiness as something the factory owns, whoever holds the original. You do not need to duplicate your contractor's back office. You do need to know what exists, be able to get it fast, and have looked at it recently enough to know that it is right.

The file the factory should hold itself

Some documents should never depend on a contractor's response time. Keep your factory licence and your establishment's registration under the applicable law, along with a current list of every contractor working at the site: legal name, nature of work, the area they work in, and the number of workers deployed. Keep the signed agreement and work orders for each one. Keep a copy of each contractor's licence, and check the expiry date and the number of workers it covers against your actual headcount. The OSH Code sets the licensing threshold at fifty contract workers, up from twenty under the older Contract Labour Act, so ask your consultant how that applies to each contractor and how older licences are treated in the transition. Keep whatever you relied on to decide that the work is permitted as contract work, because core and non-core activity is a question an inspector may raise. Finally, keep your own gate or attendance records for contract workers. That last item matters more than it looks, because it is the only record in this list that the contractor did not produce, which makes it your independent check on everything else.

The file you should be able to get within hours

The second set usually sits with whoever the agreement makes responsible, and for most factories that means the contractor. Ask for an employee register covering every worker deployed at your site, attendance or muster records, wage registers, and proof of wage payment through the bank rather than a summary statement. Ask for appointment letters, which the codes require, and identity details for each worker. Ask for PF and ESI remittance proof that lets you see individual workers, not just a total challan. Include the bonus statement for the last accounting year and the leave records. For workers from other states, keep the details of where they came from and who brought them. Do not get attached to old form numbers. The older contract labour rules had numbered forms for each register, and the codes and the draft rules reorganise them, with electronic registers contemplated. Ask your consultant what the current format is, and ask your contractor to confirm in writing that its records follow it. Then test the arrangement once. Pick an ordinary weekday, ask for last month's wage register for your site, and note how long it takes to arrive.

What an inspection actually tests

Having all the documents is not the same as passing, because the real test is whether they agree with each other and with the floor. The names of the workers present today should appear in the employee register. Days marked in the muster should match your gate records. Days worked and the rate in the wage register should lead to the amount credited to the bank. The same people should appear in the PF and ESI remittance for that month, on wages consistent with what they were paid. The rate should meet the current Telangana minimum wage notification for that category of work, which is revised periodically, so check the classification as well as the number: a machine operator recorded as a helper is a wage issue even when the helper rate is correctly paid. A worker's own account is part of this too. An inspector can speak to workers directly, and if they describe different hours, deductions or pay from what the registers show, the registers lose most of their value. Run this comparison yourself before anyone else does, using a small sample each month. Five or ten names taken across all the records will show you the pattern quickly.

Handling the day itself

Decide now who receives an inspector, and name a deputy for when that person is on leave. The security desk should know who to call and should not turn anyone away or leave them waiting without explanation. It is reasonable to politely confirm who the visitor is and which department they represent, and to note that in a log. Bring in your HR or compliance lead, and call the contractor's representative straight away. Provide what is asked for, and keep a list of every document you hand over or that is taken away, with copies where you can. Answer the question asked, accurately, and if you do not know, say that you will check rather than guess. Three things tend to turn a manageable visit into a serious one, and none of them should ever happen. Do not move contract workers out of sight or send them home for the afternoon. Do not coach workers on what to say or stand over them while they are being spoken to. Do not create or backdate a register to fill a gap. A missing record is a compliance problem that can usually be addressed; a fabricated one raises a far more serious question, and obstructing an inspector can create liability of its own. If a statement is requested, read it before signing and take advice if it goes beyond facts you actually know.

After the visit

Write up the visit the same day while memories are fresh: who came, what they looked at, who they spoke to, what they took and what they said. Then watch for anything in writing, and diarise every date on it. Do not leave a deadline for the contractor to handle alone, even if the finding concerns the contractor's records, because the notice may be addressed to you. The codes also leave some room to fix things. The Code on Wages provides for a written direction with a period to comply before prosecution for certain offences, and for compounding of certain offences, though neither is universal, and a repeat violation can remove the chance to comply first. Which offences qualify, and how the other codes deal with the same question, is something to confirm with your consultant for the specific finding. The practical point is simple: a finding that is answered on time, with evidence of the fix, is in a very different position from one left to drift. Require the contractor to correct its own gaps and show you the proof, then use the agreement if it fails to do so. Finally, ask what the finding says about your monthly check, since whatever the inspector found was probably there for you to find first.

What to put in the agreement, and how to keep it routine

Most of this becomes easier if the manpower agreement anticipates it. The contractor should be required to keep all statutory records current and in the prescribed format, keep them available for your site, and hand over copies within a stated number of hours when you ask or when an authority does. It should also send a representative promptly on the day of any inspection, give you sight of any notice it receives relating to your site, and fix any finding against it within a stated time. Give the factory the right to audit the records, withhold the relevant amount from pending invoices while a statutory default remains uncorrected, and recover from the contractor anything you are made to pay on its behalf, backed by an indemnity. Then keep a short routine: a monthly sample reconciliation by site HR, a check of licence expiry dates, and one folder per contractor per month. When you evaluate a new vendor, ask to see a redacted sample of a wage register and a remittance proof before you sign. How easily those appear tells you most of what you need to know about how the first inspection will go.

An inspection is mostly a test of whether your records and your floor tell the same story, and you can run that test yourself every month at little cost. Hold your own file, know you can get the contractor's within hours, and agree in advance who does what on the day. If you are reviewing your current contractor arrangements or evaluating a manpower agency, FactoryForce can walk you through how records for deployed workers are documented for our clients; request a quote or reach us on WhatsApp. The labour codes, Telangana's rules under them, register formats, licensing thresholds, minimum wages and penalty provisions are set by statute and notification and revised periodically, so verify current requirements with your labour-law consultant before relying on anything here.

Ready to Get Started?

Need workers for your factory?
Let's talk.

Tell us your requirement — role, quantity, site. We'll have workers on your floor within 48 hours.

Looking for work instead? हैदराबाद में काम चाहिए →